The project includes package 1 & 2 for APCO Infratech and Pkg 4 for Gawar Infra.
The project includes the installation of high masts and 9 meter and 10 meter lighting poles and line shifting as well Completed Highway Electrification Street Lighting, HT Connection, LT Connection.
The project includes the installation of high masts and 9 meter and 10 meter lighting poles and line shifting as well.
TMS with internal software for 3 one main toll and 2 small toll LT panel manufacturing and installation for lighting for the highway.